Social Welfare Equipment Building Tetuán (Madrid)

Geothermal exchange system for the air conditioning of the Tetuán Social Welfare Equipment building, executed to cover 100% of the thermal demand. Water-water heat pump for heating, cooling and preheating of ACS and high temperature water-water heat pump for final heating of ACS.

Characteristics

  • Category

    New construction

  • Promoter

    Apostolic of the Heart of Jesus

  • Geological material

    Thick arkoses and ocher shales

  • Heated surface

    1.470m²

  • Thermal production

    Water-water heat pumps

  • GIS Power

    124 kW heating, 100 % of peak load.
    110 kW cooling, 100 % of peak load.

  • GIS Covered Demand

    100 % heating: 57 MWh/year.
    100 % DHW: 55 MWh/year.
    100 % cooling: 78 MWh/year.

  • Geothermal exchange circuit

    1,500 m drilling: 12 x 125 m

  • Distribution

    2 tubes

  • Issuers

    Underfloor heating and fan convectors

  • Expected energy savings

    112 MWh EP/year (savings 64 %)

  • Commissioning

    January 2023